Handover is the day the purchase stops being a promise. The unit is finished, the keys are ready, and someone hands you a clipboard with a form that says you accept it.

Most buyers sign. They walk through with the salesperson, admire the view, take a few photos, and treat the snag list as a formality. Then they move in and spend their first year finding the things that should have been corrected before they signed.

This is the hour that protects the next five years.

The short answer

Inspect before you accept. Test everything that moves, flows or switches. Write every defect on a dated list, have the developer sign it, and agree in writing when each item will be fixed. Do not sign a final acceptance form for a unit you have not inspected, and do not accept a verbal promise that the list will be handled.

If the developer resists a written list, you have learned something important before it cost you anything.

Handover is a process, not a day

There are usually three moments, and they are not the same.

  • The inspection. You walk the unit and record defects. Nothing should change hands yet.
  • The rectification period. The developer fixes the listed items. The clock should be written down.
  • Final acceptance. You confirm the items are closed and take formal delivery.

Buyers often blur these into one afternoon. Ask which document you are signing at each stage and what it obliges you to accept. A signature at the wrong stage is hard to reverse.

What to bring

  • A notebook and a phone with a working camera.
  • The specification schedule and the floor plan, so you can compare what is there with what was sold.
  • A tape measure, a small spirit level, and a phone torch.
  • A socket tester if you can get one, and a charger for testing outlets.
  • A bottle of water for testing drainage and a cloth for checking finishes.
  • A list of the appliances and fittings that were promised in the contract.
  • A friend. One person inspects, one person writes. Two sets of eyes find twice as much.

Test, do not look

The most common mistake on handover day is looking instead of testing. A tap that is fitted is not a tap that runs. A socket that exists is not a socket that works.

  • Water. Run every tap, shower and hose point. Check hot and cold. Watch how fast each drain clears, then fill the basin and let it go at once. Look under and behind for damp.
  • Air conditioning. Switch every unit on, let it run, and confirm it cools and that the condensate drains somewhere sensible rather than down a wall.
  • Electricity. Test every socket and switch, including the exterior and bathroom points. Confirm the breakers trip when tested and label them.
  • Doors and windows. Open and close every one. Check the locks, the handles, the seals and the direction of swing. Listen for draught and rattle, which matter more on a coast than inland.
  • Joinery. Open every drawer and cupboard. Check the alignment, the soft close, and the edges where the veneer meets humidity.
  • Tiling and stone. Tap for hollow spots, check the grout lines, and look for lippage at the edges.
  • Sanitaryware. Confirm the flush, the sealant lines, and that nothing rocks.
  • The exterior. Check the balcony or terrace drain, the railings, the privacy screens and the condition of any outdoor paint.

The room-by-room notes that matter

Do not write “bedroom 2 has issues”. Write what, where and how bad.

  • Room, wall or fixture, and the exact defect.
  • A photograph with the room in frame, plus a close-up.
  • Whether it is cosmetic, functional or structural.
  • Whether it blocks living in the unit or can wait.

A list that a contractor can act on gets fixed. A list that reads “general finishing” gets a shrug.

The documents that should change hands

The keys are the least important thing you receive. Ask for the rest in writing.

  • The completion certificate or the document that defines what “delivered” means in your contract.
  • The warranty terms, with the start date and what is covered.
  • The as-built drawings and the specification schedule as built, not as marketed.
  • Manuals and guarantees for appliances, air conditioning and any installed systems.
  • Meter numbers for electricity and water, and confirmation that accounts are in your name.
  • The service charge budget, the share for your unit, and the collection date.
  • The owners’ association documents and the point at which control passes.
  • A receipt for every payment made, and a statement of what remains.

If an item is promised for later, it should appear on the snag list with a date. “We will send it” is not a handover document.

Snag list rules

  • Write it during the inspection, not after.
  • Date it and have the developer’s representative sign the same copy.
  • Number every item so it can be closed one by one.
  • Record a date for rectification on the list itself.
  • Keep a signed copy and photograph every page.
  • Agree how closures will be confirmed, and by whom.
  • Do not sign final acceptance until you have re-inspected the closed items.

Some developers offer a retention or a holdback until items are fixed. If that is available, take it. If it is not, get the rectification dates in writing instead.

What usually goes wrong

  • The unit is handed over before the list is completed.
  • Cosmetic damage is repaired with paint over a problem.
  • External doors and windows leak in the first rain or sandstorm.
  • Air conditioning drains into a wall or onto a neighbour’s terrace.
  • Drainage is slow because the fall is wrong under the tiles.
  • The specification delivered is a level below the one sold.
  • Meters are still in the developer’s name months later.
  • Appliances arrive without manuals or guarantees.
  • The snag list is “in the system” but has no owner and no date.

Red flags

  • Pressure to sign acceptance on the same day as the inspection.
  • No snag list allowed, or a list that the developer keeps.
  • “It will all be done before you move in” with nothing in writing.
  • A completion certificate with no date and no reference to the contract.
  • Meter accounts not transferred at handover.
  • No service charge budget at the point of delivery.
  • A handover team that cannot name who is responsible for fixes.

The first thirty days

Handover does not end at the door. In the first month, live in the unit properly and keep a second list.

  • Run the air conditioning daily and watch for condensation.
  • Use every appliance at least once.
  • Watch the walls after the first heavy rain and after the first sandstorm.
  • Check the meters against your actual use.
  • Report anything that fails under warranty immediately, in writing.
  • Keep the snag list open until you are satisfied, not until someone asks you to close it.

The mistakes buyers make

  • Treating handover as a ceremony rather than an inspection.
  • Signing an acceptance form before the walk-through.
  • Looking at finishes instead of testing systems.
  • Accepting a verbal snag list.
  • Not bringing the specification to compare against.
  • Inspecting alone, with no one taking notes.
  • Leaving the meter transfer to later.
  • Closing the list before re-inspecting the repairs.

A handover is not the day you receive a unit. It is the day you agree what was delivered.

Where our releases sit

Al Arabia builds in Al Kawther in the south and Al Ahyaa in the north. For Mark Resort and Athena Resort, our team will walk you through the specification, the snag list process and the handover documents before you accept delivery. Talk to the team or compare the current releases.

For what should be in writing before delivery, read Before the Signature. For the annual cost that starts at handover, read The Second Price.

See it in our projects: Hurghada Heights and Lavanda Beach Resort are both selling now in Hurghada. For current units, prices and payment plans, message our team on WhatsApp.

Ready to talk it through?

Our team can walk you through the details for any of our communities.

Contact Us